Buyers Guide
When buying a home it is important to
be aware of every aspect of building, so that you can decide exactly what you
want, and get exactly what you pay for. This guide will provide Queensland home
buyers with all the information and advice you would
need. Please feel free to print this information for your
reference.
Written by Greg Byrne
Budgeting
Take in to account the full
situation - loan set up costs, land purchase, legal costs, construction cost,
additional costs after construction e.g. driveways, landscaping and additional
furniture required for the new house and how much of this you can complete
yourself. This will save you a lot of heartache when pricing your new home, tell
your builder the budget before you start looking at designs. Be clear on
your budget and your housing needs.
Purchasing Land
Topographic Features
It is a good idea to purchase land
in a new area. If you plan to sell your house for any reason, it will sell more
readily in a new area; partly due to the positive visual impact of the other new
homes surrounding it on top of new facilities and leisure areas such as parks.
Consider the aesthetic value of the land - if it has a nice view - it will be
worth more. The situation of the block in relation to shops, schools and other
facilities is also a very important factor to consider when selecting land look
at the services provided; i.e. power (underground supply, property pole or
aerial supply), water (town supply, bore or other), sewerage (town system,
septic tank system or clear water system). Access to the block should be known
and inspected before buying a block - the cost of putting in a gravel road can
be substantial.
Site Classification
These days, the developers are
having the soil tests carried out on the blocks (rather than the buyer) so it
pays to find out what the site classification is before you buy. A class "S"
(stable) site will be far cheaper to build on than a class "P" (problem) site. A
problem site is usually very unstable, soft soil. The classification can effect
the price of the house by thousands of dollars. Most sites on the Tablelands are
class "M" (moderate).
Sloping Blocks
Sloping blocks aren’t as terrible
as some people perceive them to be... they are usually accompanied with a good
view, and this in turn increases their value. Sloping blocks lend themselves to
elevated houses, timber floors are great for the house because cool breezes flow
beneath the house and keep it cool. Having a garage under the house is another
advantage of sloping land, because of the lower cost for the ground floor and
the space beneath the house is put to good use. Also, sloping blocks have better
site drainage.
House Design
In relation to the design of your
new home, the following points should be considered:
Type of living
The type of living you will choose
should reflect your lifestyle. For example, if you are planning to have, or
already have children, the numbers of bedrooms you require is an issue. Whether
to have an ensuite and walk-in robe (WIR) or not. If you like outdoor or indoor
entertaining . Choosing to have verandahs or patios for outdoor entertainment
areas or choose large living areas inside the house.
Specific Products.JPG)
These are the particular products
you want to use in the construction of your home which determine the quality,
the costs and the maintenance of the end product. For example, concrete or
timber floors - masonry block or brick veneer or steel framed walls clad with
Hardiplank; colourbond or tiled roofs.
Energy Efficiency in Design
This is the process of utilising
particular products and designs to your advantage to make your new home more
energy efficient. For instance, using timber on decks or verandahs rather than
concrete will reduce the transfer of heat into the main slab, cooling the house.
The type of glass in windows and doors (whether it is tinted or not). The hot
water system: solar, electric or gas. The insulation used in the roof and walls.
The actual design of the house e.g. wide overhangs on the roof and the cladding
product on the outside walls all go into making the house more energy efficient.
In 1989 Byrne Homes made the
decision, not to use rainforest timbers where possible, and only to use
renewable plantation timber resources to save on our natural forests. The
majority of our homes these days are built with a steel frame structure.
Product Safety and Security
The long term security of the
structure of your home. Organo-chlorides are now banned for use as termite
barriers. As we live north of the Tropic of Capricorn we live in a very high
risk area for termites, and you will need to choose a method of termite
protection to suit your area. There are several methods for termite control,
which are listed below:
-
Termite shielding for suspended
floors
-
Concrete slabs as a barrier
-
Barrier mesh management system
-
Graded stone management system
-
Chemical soil management system
-
Termite resistant materials
Byrne Homes uses a combination of
both the Barrier Mesh System and Termite Resistant Materials. This system is
environmentally friendly as there are no chemicals used, and will last the life
of the house not the life of the chemical.
Builder Selection
When choosing your builder, you
should observe the following details:
Budget
Be clear on your budget and housing
needs.
Building Services Authority Licence
Check with the Building Services
Authority that the builder is licensed - this advise is free. You can also
obtain a report from the BSA on a builder, which will inform you of their
licence number, number of jobs performed and any orders issued by the BSA to
rectify problems the builder has caused, however there is a fee for this. For
more information, visit www.bsa.qld.gov.au
What the builder specialises in
Does the builder
specialise in small renovations or large projects? A large home builder has the
equipment, staff numbers and capability to build an entire new home, whereas a
renovations specialist may only have the capacity to do small repairs. Ask for
the starting date and construction period it will take to build your home before
you sign the building contract. Sixteen weeks is the average construction time
for a normal sized home. If the builder wants thirty weeks to complete the house
you should consider the extra rent you will be paying.
At Byrne Homes we
specialise in one off designs, as we find this gives our clients greater freedom
to fulfil their needs at a sensible price.
Location
Today we see builders
servicing areas all over North Queensland and one of the main considerations is,
"Will the builder be here to service the house in a few years time?" and, "How
long will I have to wait if there is a problem to be fixed if the builder is not
in the local area?"
Reputation, Experience & History
The reputation and history of your
builder is very significant. The more experience and positive the history of
your builder is, the better the quality of the end product. Talk to past
customers about the customer service and reliability of the builder, as well as
the quality of their work (ask the salesperson for names and contact details of
previous clients in your area).
Know what you are getting
Many home buyers find it difficult
to visualise the features of a home from the floor plan alone, Byrne Homes uses
a CAD Program (Computer Assisted Drafting) which gives a three dimensional walk
through of the home before it is built. This CAD program is offered free to all
Byrne Homes clients. Can your builder guarantee your new home will turn out the
way you plan it to be.
Evaluating Quotations
One of the hardest things to
do is to evaluate different quotations received for your new home. The old
saying, apples for apples applies, what you need to do is make your own list of
items included. Compare the Prime Costs (PC) and Provisional Sum (PS) values,
the easiest way to lower the cost of a house is to have lower PC and PS values.
Make sure each quote includes the same items in the house and that nothing is
missed. All this takes time but is well worth the time spent in doing so, it is
no use signing a contract only to find out later certain items were not included
e.g.. clothes hoist, towel rails etc. The cheapest quote may not always be the
best when all factors are considered.
Contract Agreement
Domestic Contracts
As of the 1st of July 2000 the new
Domestic Contracts Act 2000 came into effect. The Act regulates contracts
between builders and owner for the construction of a single detached dwelling or
a duplex.
Foundation Data
If the work proposed under a
contract will require the construction of footings or slab for a building, the
building contractor must obtain foundation data that is appropriate for the
building site before entering into a contract; having regard to the Building
Contract of Australia, the need for a drainage plan, engineers drawing, soil
test etc. This should be done under a Preliminary Agreement before entering the
building contract.
Construction Period
The time schedule to a contract
must state the start date and the completion date, or if the start date is not
known, the number of days that will be required to finish the work once started
-
The new schedule must also show
how many days have been allowed for
-
Inclement weather having regard
to the time of year when the work is being done
-
Non working days (eg Public
holidays)
-
Any other likely cause of delay
Failure to do so will attract a
penalty for the builder.
P.C. Items (Prime Cost) and P.S. Items (Provisional Sums)
Definition:
A PC Item (Prime Cost): is an
allowance made in the tender or contract for the supply and delivery only of an
item/s of material (ie taps, baths, light fittings) that have not been selected
at the time of the tender or before the contract was signed and does not include
labour to install.
A proprietor owner would normally
make the final selection of the item, which is subject to a PC allowance.
A PS Item (Provisional Sum): is an
allowance made in a tender or contract for particular work for which the scope
could not be finalised before the tendering or signing of a contract. This
allowance includes the total cost of the supply and installation labour.
Such items as kitchen cupboards, building platform, water treatment systems etc.
Where PC and PS item allowances have been shown in a tender or contract
document, the amount is inclusive of GST.
When discussing PC and PS amounts,
remember:
-
Allowances for PC and PS items must be reasonable.
-
If breached a penalty of up to
$3750 will be applied to the builder by the BSA.
-
The PC and PS schedule to the
contract must list a detailed description of the item and contracted services
to which the sum relates, and a breakdown of the cost estimates provided for
in the allowance. The breakdown must show at least the quantity of materials
involved and the unit cost to the contractor. Copies of the supporting
documentation must be given to the consumer when seeking payment under the
related progress payment.
It is therefore imperative that
builders make reasonable estimates. At Byrne Homes we strive to give you the
most accurate costs for all items.
Progress Payments.jpg)
Deposits will be limited to 5% of
the contract sum on contracts over $20,000 Parties cannot contract out of these requirements.
Progress payments will be required
at defined stages (e.g. deposit, base stage, frame stage, enclosed stage, fixing
stage and practical completion) with the current percentage rates.
If minor defects or omissions exist
at the completion payment (practical completion) they are to be listed on a
defects document which is to be signed by both parties. A full payment can then
be made.
Cooling-off Period
Owners will have the right to
withdraw from any contract over $3,000 during an imposed 5 day cooling-off
period.
All contracts must contain a notice
advising the consumer of their rights to the cooling-off period
To withdraw from the contract the
consumer must give a written withdrawal notice to the contractor, and pay the
contractor any expenses incurred by the contractor plus a penalty of $100.
Variations
Variations are to be put into a
written form within the shortest practical time, or, if the variation consists
of an addition to the works, before work subject to the variation is carried
out. The variation form must obtain the following:
-
Describe the variation
-
If the variation is sought by the
contractor, the reason for the variation
-
The effect the variation will
have on the work as a whole
-
If the variation will result in a
delay of the works, an estimate for the delay
-
State the change of the contract
price because of the variation
-
Make appropriate provisions for
the variation to be paid at the relevant progress claim.
-
The variation must be signed and
a copy given to the consumer within five days.
Other Matters
Implied warranties extend for a
period of six years and six months from the date of practical completion.
However, it does not apply if a deficiency or defect arises from instructions
from the Owner or Architect contrary to the Builders written advice.
BSA (Building Services Authority)
The role of the Building Services
Authority before, during and after the construction of your new home is:
-
Licence all builders and trade
contractors who carry out work within the Building Industry
-
Run the Statutory Insurance
Scheme which provides protection against non completion of works, defective
construction, and subsidence or settlement of buildings
-
Provide information and
assistance in dealing with disputes through the Dispute Management Division
for consumers and contractor.
-
Publish and sell the Building
Contract for Residential Construction and the Minor Works Contract.
For more information about
building, please contact Byrne Homes:
sales@byrnehomes.com.au or phone 07) 40921